Structural Rebuild‍

Location:
Julia Court, Barking
Value:
£23,000
Duration:
3 Months

A full structural floor replacement was required following damage to the original construction. Louis Scot carried out works in collaboration with a structural engineer.

No items found.
Scope of Work:
  • Removal of finishes and damaged wall/floor structure
  • Waterproofing installation and structural rebuild
  • Full reinstatement of all internal services and finishes
Key Outcomes:
  • Property structurally secured and fully reinstated
  • All works delivered with structural oversight
  • Resident returned to safe and habitable property